Skip to content

Power Platform deployment readiness

This content is for 2025. Switch to the latest version for up-to-date documentation.

This page documents the Power Platform managed-solution readiness path for NSW-style governance without overclaiming production status.

  • Template-only readiness documentation.
  • Real NSW tenant deployment is not claimed yet.
  • Evidence bundles are required before any public readiness claim.
  1. Tenant deployment readiness template completed.
  2. Managed promotion runbook evidence recorded for each environment.
  3. Tenant credentials present and verified (service principal, secret reference, environment IDs).
  4. Import and smoke evidence present for all managed promotions.
  5. Rollback evidence captured and runnable.
  • Missing tenant service principal.
  • Missing tenant client secret or secret reference.
  • Missing target environment ID.
  • Missing tenant connectivity verification.
  • Missing solution checker/import logs.

The evidence bundle template is at: power-platform/evidence/nsw-operational-readiness-bundle-template.json.

It is intentionally strict: unresolved credentials keep readiness as blocked until resolved.

  • Keep orchestration thin and logic out of low-code expressions.
  • Require managed solutions for downstream environments.
  • Capture explicit approvals, logs, and rollback evidence for each promotion step.